Rody and Ryan working the dirt.
Many others had the same idea as there were at least 25 or maybe 30 people on scene to get some trail work done.
A crew attacks the Over Under.
We raked, groomed, and even cut some new trail. On Cheater's Hill we did a reroute which should add some more excitement to this downhill section. The trail was routed back and forth between the banks to make a kind of half pipe run down to the corner at the bottom. A berm was built at the bottom as well.
The work gets done in a hurry when an
armed mob descends on the task.
Several guys gave the new section a test ride. Looks like it will be a bit of a challenge to control speed, find the line, and make it through the final corner in one piece.
Dropping in at the top. I helped with a lot of
work here, placing and supporting the log
and cutting in the trail.
Hitting the new berm at the bottom.
It was a great afternoon of work, a lot was accomplished. I look forward to helping out more in the future. Daniel would probably like to come out and play in the dirt too!
No comments:
Post a Comment